ХАЛЛ ГРУПП · Equipment catalogue
Steel wire ropes 6×19
Constructions: 6×19+FC; 6×19+IWS; 6×19+IWRC. The table lists diameters, approximate weights and minimum breaking loads by tensile-strength grade.
Photographs and drawings

Technical parameters
Constructions: 6×19+FC; 6×19+IWS; 6×19+IWRC. The table lists diameters, approximate weights and minimum breaking loads by tensile-strength grade.
A diameter row is not a fully specified configuration. Select core and tensile-strength grade from the applicable table columns. Specify construction, core, tensile grade, finish, lay, diameter tolerance and length when ordering. NF denotes natural fibre core, SF synthetic fibre core; FC fibre core and IWRC/IWS steel core follow the table notation. MBL is minimum breaking load, not working load limit. Lifting and special applications require selection calculations and documentation for the supplied configuration.
Scroll the table horizontally. Each diameter row still requires selection of the core and tensile-strength grade.
| Configuration | Diameter mm | Weight, natural NF kg/100m | Weight, synthetic SF kg/100m | Weight, IWRC/IWS kg/100m | MBL FC, 1670 MPa kN | MBL IWRC/IWS, 1670 MPa kN | MBL FC, 1770 MPa kN | MBL IWRC/IWS, 1770 MPa kN | MBL FC, 1870 MPa kN | MBL IWRC/IWS, 1870 MPa kN | MBL FC, 1960 MPa kN | MBL IWRC/IWS, 1960 MPa kN | MBL FC, 2160 MPa kN | MBL IWRC/IWS, 2160 MPa kN | IMPA correspondence |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Ø3 mm | 3 | 3.11 | 3.03 | 3.43 | 4.61 | 4.99 | 4.89 | 5.29 | 5.17 | 5.59 | 5.41 | 5.85 | 5.97 | 6.45 | A direct IMPA code is not confirmed |
| Ø4 mm | 4 | 5.54 | 5.39 | 6.10 | 8.20 | 8.87 | 8.69 | 9.40 | 9.19 | 9.93 | 9.62 | 10.40 | 10.61 | 11.47 | 212101 Execution requires verification 6×19 · Ø4 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 4 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212101 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212126 Execution requires verification 6×19 · Ø4 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 4 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212126 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø5 mm | 5 | 8.65 | 8.43 | 9.53 | 12.80 | 13.90 | 13.60 | 14.70 | 14.40 | 15.50 | 15.00 | 16.20 | 16.58 | 17.93 | 212102 Execution requires verification 6×19 · Ø5 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 5 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212102 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212127 Execution requires verification 6×19 · Ø5 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 5 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212127 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø6 mm | 6 | 12.50 | 12.10 | 13.70 | 18.50 | 20.00 | 19.60 | 21.20 | 20.70 | 22.40 | 21.60 | 23.40 | 23.87 | 25.82 | 212103 Execution requires verification 6×19 · Ø6 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 6 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212103 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212128 Execution requires verification 6×19 · Ø6 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 6 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212128 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø7 mm | 7 | 17.00 | 16.50 | 18.70 | 25.10 | 27.20 | 26.60 | 28.80 | 28.10 | 30.40 | 29.40 | 31.80 | 32.49 | 35.14 | A direct IMPA code is not confirmed |
| Ø8 mm | 8 | 22.10 | 21.60 | 24.40 | 32.80 | 35.50 | 34.80 | 37.60 | 36.70 | 39.70 | 38.50 | 41.60 | 42.44 | 45.90 | 212105 Execution requires verification 6×19 · Ø8 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 8 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212105 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212130 Execution requires verification 6×19 · Ø8 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 8 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212130 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø9 mm | 9 | 28.00 | 27.30 | 30.90 | 41.50 | 44.90 | 44.00 | 47.60 | 46.50 | 50.30 | 48.70 | 52.70 | 53.71 | 58.09 | 212106 Execution requires verification 6×19 · Ø9 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 9 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212106 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212131 Execution requires verification 6×19 · Ø9 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 9 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212131 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø10 mm | 10 | 34.60 | 33.70 | 38.10 | 51.30 | 55.40 | 54.30 | 58.80 | 57.40 | 62.10 | 60.00 | 65.00 | 66.31 | 71.71 | 212107 Execution requires verification 6×19 · Ø10 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 10 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212107 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212132 Execution requires verification 6×19 · Ø10 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 10 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212132 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø11 mm | 11 | 41.90 | 40.80 | 46.10 | 62.00 | 67.10 | 65.80 | 71.10 | 69.50 | 75.10 | 72.80 | 78.70 | 80.24 | 86.77 | A direct IMPA code is not confirmed |
| Ø12 mm | 12 | 49.80 | 48.50 | 54.90 | 73.80 | 79.80 | 78.20 | 84.60 | 82.70 | 89.40 | 86.60 | 93.70 | 95.49 | 103.27 | 212109 Execution requires verification 6×19 · Ø12 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 12 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212109 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212134 Execution requires verification 6×19 · Ø12 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 12 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212134 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø13 mm | 13 | 58.50 | 57.00 | 64.40 | 86.60 | 93.70 | 91.80 | 99.30 | 97.00 | 105.00 | 101.00 | 110.00 | 112.07 | 121.19 | A direct IMPA code is not confirmed |
| Ø14 mm | 14 | 67.80 | 66.10 | 74.70 | 100.00 | 109.00 | 107.00 | 115.00 | 113.00 | 122.00 | 118.00 | 127.00 | 129.97 | 140.56 | 212111 Execution requires verification 6×19 · Ø14 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 14 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212111 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212136 Execution requires verification 6×19 · Ø14 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 14 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212136 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø16 mm | 16 | 88.60 | 86.30 | 97.50 | 131.00 | 142.00 | 139.00 | 150.00 | 147.00 | 159.00 | 154.00 | 166.00 | 169.76 | 183.58 | 212112 Execution requires verification 6×19 · Ø16 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 16 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212112 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212137 Execution requires verification 6×19 · Ø16 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 16 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212137 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø18 mm | 18 | 112.00 | 109.00 | 123.00 | 166.00 | 180.00 | 176.00 | 190.00 | 186.00 | 201.00 | 195.00 | 210.00 | 214.85 | 232.35 | 212113 Execution requires verification 6×19 · Ø18 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 18 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212113 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212138 Execution requires verification 6×19 · Ø18 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 18 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212138 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø20 mm | 20 | 138.00 | 135.00 | 152.00 | 205.00 | 222.00 | 217.00 | 235.00 | 230.00 | 248.00 | 240.00 | 260.00 | 265.25 | 286.85 | 212114 Execution requires verification 6×19 · Ø20 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 20 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212114 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212139 Execution requires verification 6×19 · Ø20 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 20 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212139 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø22 mm | 22 | 167.00 | 163.00 | 184.00 | 248.00 | 268.00 | 263.00 | 284.00 | 278.00 | 300.00 | 291.00 | 315.00 | 320.95 | 347.09 | 212115 Execution requires verification 6×19 · Ø22 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 22 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212115 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212140 Execution requires verification 6×19 · Ø22 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 22 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212140 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø24 mm | 24 | 199.00 | 194.00 | 219.00 | 295.00 | 319.00 | 313.00 | 338.00 | 331.00 | 358.00 | 346.00 | 374.00 | 381.96 | 413.06 | 212117 Execution requires verification 6×19 · Ø24 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 24 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212117 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212142 Execution requires verification 6×19 · Ø24 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 24 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212142 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø26 mm | 26 | 234.00 | 228.00 | 258.00 | 347.00 | 375.00 | 367.00 | 397.00 | 388.00 | 420.00 | 406.00 | 440.00 | 448.27 | 484.77 | 212119 Execution requires verification 6×19 · Ø26 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 26 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212119 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212144 Execution requires verification 6×19 · Ø26 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 26 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212144 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø28 mm | 28 | 271.00 | 264.00 | 299.00 | 402.00 | 435.00 | 426.00 | 461.00 | 450.00 | 487.00 | 471.00 | 510.00 | 519.89 | 562.22 | 212120 Execution requires verification 6×19 · Ø28 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 28 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212120 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212145 Execution requires verification 6×19 · Ø28 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 28 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212145 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø30 mm | 30 | 311.00 | 303.00 | 343.00 | 461.00 | 499.00 | 489.00 | 529.00 | 517.00 | 559.00 | 541.00 | 585.00 | 596.81 | 645.41 | 212121 Execution requires verification 6×19 · Ø30 mm · 200 m coil Matching conditionsThe base construction 6×19 and nominal diameter 30 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212121 specifies galvanized steel and a 200 m coil. The OEM row does not establish finish or coil length; galvanized execution and 200 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. 212146 Execution requires verification 6×19 · Ø30 mm · 220 m coil Matching conditionsThe base construction 6×19 and nominal diameter 30 mm match; OEM table constructions: 6×19+FC, 6×19+IWS, 6×19+IWRC. IMPA 212146 specifies galvanized steel and a 220 m coil. The OEM row does not establish finish or coil length; galvanized execution and 220 m length still require confirmation. Select and confirm the required FC / IWS / IWRC core separately. Tensile grade (MPa), breaking force, working load limit, lay and documents must be agreed for the offered execution. This is a selection candidate, not a confirmed replacement. |
| Ø32 mm | 32 | 354.00 | 345.00 | 390.00 | 525.00 | 568.00 | 556.00 | 602.00 | 588.00 | 636.00 | 616.00 | 666.00 | 679.03 | 734.33 | A direct IMPA code is not confirmed |
| Ø34 mm | 34 | 400.00 | 390.00 | 440.00 | 593.00 | 641.00 | 628.00 | 679.00 | 664.00 | 718.00 | 695.00 | 752.00 | 766.57 | 828.99 | A direct IMPA code is not confirmed |
| Ø36 mm | 36 | 448.00 | 437.00 | 494.00 | 664.00 | 719.00 | 704.00 | 762.00 | 744.00 | 805.00 | 780.00 | 843.00 | 859.40 | 929.39 | A direct IMPA code is not confirmed |
| Ø38 mm | 38 | 500.00 | 487.00 | 550.00 | 740.00 | 801.00 | 785.00 | 849.00 | 829.00 | 896.00 | 868.00 | 940.00 | 957.55 | 1035.52 | A direct IMPA code is not confirmed |
| Ø40 mm | 40 | 554.00 | 539.00 | 610.00 | 820.00 | 887.00 | 869.00 | 940.00 | 919.00 | 993.00 | 962.00 | 1041.00 | 1060.99 | 1147.39 | A direct IMPA code is not confirmed |
| Ø42 mm | 42 | 610.00 | 594.00 | 672.00 | 904.00 | 978.00 | 959.00 | 1040.00 | 1010.00 | 1100.00 | 1061.00 | 1147.00 | 1169.74 | 1265.00 | A direct IMPA code is not confirmed |
| Ø44 mm | 44 | 670.00 | 652.00 | 738.00 | 993.00 | 1070.00 | 1050.00 | 1140.00 | 1110.00 | 1200.00 | 1164.00 | 1260.00 | 1283.80 | 1388.34 | A direct IMPA code is not confirmed |
| Ø46 mm | 46 | 732.00 | 713.00 | 806.00 | 1080.00 | 1170.00 | 1150.00 | 1240.00 | 1210.00 | 1310.00 | 1273.00 | 1376.00 | 1403.16 | 1517.43 | A direct IMPA code is not confirmed |
| Ø48 mm | 48 | 797.00 | 776.00 | 878.00 | 1180.00 | 1280.00 | 1250.00 | 1350.00 | 1320.00 | 1430.00 | 1386.00 | 1499.00 | 1527.83 | 1652.24 | A direct IMPA code is not confirmed |
| Ø50 mm | 50 | 865.00 | 843.00 | 953.00 | 1280.00 | 1390.00 | 1360.00 | 1470.00 | 1440.00 | 1550.00 | 1504.00 | 1626.00 | 1657.80 | 1792.80 | A direct IMPA code is not confirmed |
| Ø52 mm | 52 | 936.00 | 911.00 | 1030.00 | 1390.00 | 1500.00 | 1470.00 | 1590.00 | 1550.00 | 1680.00 | 1627.00 | 1759.00 | 1793.08 | 1939.09 | A direct IMPA code is not confirmed |
| Ø54 mm | 54 | 1010.00 | 983.00 | 1110.00 | 1500.00 | 1620.00 | 1580.00 | 1710.00 | 1670.00 | 1810.00 | 1754.00 | 1897.00 | 1933.66 | 2091.12 | A direct IMPA code is not confirmed |
| Ø56 mm | 56 | 1090.00 | 1060.00 | 1190.00 | 1610.00 | 1740.00 | 1700.00 | 1840.00 | 1800.00 | 1950.00 | 1887.00 | 2040.00 | 2079.54 | 2248.89 | A direct IMPA code is not confirmed |
Include with your enquiry
- Application, lifting arrangement, WLL and required safety factor
- Material, coating, rope construction and connection design
- Length, diameter, termination, markings and supporting documents
Related sections
Request an offer
The specification, documents and supply terms are agreed for your enquiry. Supplier stock, lead time and price are confirmed in a separate offer.